Search scope:
排序: Display mode:
Research on key construction technologies of concrete dam heightening project
Zhou Hougui
Strategic Study of CAE 2012, Volume 14, Issue 7, Pages 87-92
Based on construction practice of worldwide concrete dam heightening project, 4 key construction technologiesof concrete gravity dam heightening project by the integral heightening mode on the existing dam bythe down stream side and on the dam crest were systematically summarized.The 4 key technologies are concrete raw materials and mix proportion, jionting between new concrete andand spatrial allocation curing construction period, For each key construction technology, the construction
Keywords: construction technology dam heightening concrete dam hydraulic and hydropower engineering
China's High Dams Construction and Research on Science and Technology
Chen Zongliang
Strategic Study of CAE 2000, Volume 2, Issue 12, Pages 84-89
The development and characteristics of high dams construction in China are introduced.The scientific and technological achievements and their application in geologic exploration, dam constructionThey in elude the 181 m-high concrete gravity dam in the Three Gorges Project, the 240 m — highErtan double curvature concrete arch dam, the 178 m- high Tianshenqiao No. 1 CFRD, the 182 m- high Hongjiadugravity dam, etc.
Keywords: hydroelectric power high dam gravity dam arch dam roller compacted concrete dam (RC-CD) concrete facerockfill dam (CFRD)
Feng Jin, Duruo Huang, Michel Lino, Hu Zhou
Engineering 2024, Volume 32, Issue 1, Pages 100-106 doi: 10.1016/j.eng.2023.09.020
Over the past few decades, one of the most significant advances in dam construction has been the inventionof the rock-filled concrete (RFC) dam, which is constructed by pouring high-performance selfcompactingconcrete (HSCC) to fill the voids in preplaced large rocks. The innovative use of large rocks in dam construction provides engineers with a material that Prospects for next-generation concrete dams are discussed from the perspectives of environmental
Keywords: Rock-filled concrete dam Pouring compactness Effect of large rocks Intelligent quality control Unmanneddam construction
163Concrete dam construction management and decision-making based on virtual reality
Zhou Hougui,Cao Shengrong,Wang Quande
Strategic Study of CAE 2010, Volume 12, Issue 9, Pages 63-68
Concrete dam construction management and decision-making platform isIn the platform, the multi-dimensional construction information is integrated highly, including dam constructureThe platform provides a completely new environment for concrete dam construction management and decision-makingThe platform has rich functions on concrete dam construction management and decision-making, such asconstruction information management, dam model editing, pouring bins management, construction scene roaming
Keywords: concrete dam virtual reality construction management and decision-making Danjiangkou Dam heightening
Zhou Hougui
Strategic Study of CAE 2009, Volume 11, Issue 2, Pages 17-21
Keywords: concrete demolition controlled demolition construction technology Danjiangkou Dam
GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application
Li Jingru,Zhong Denghua
Strategic Study of CAE 2005, Volume 7, Issue 8, Pages 70-74
This paper presents a GIS-based visual simulation methodology for concrete dam construction processGVSS has been applied to a real concrete dam construction project, which verified the feasibility of
Keywords: visual simulation GIS concrete dam construction schedule optimization
Key technical innovations in the construction of Baihetan Hydropower Station Project
Frontiers of Engineering Management 2023, Volume 10, Issue 2, Pages 367-372 doi: 10.1007/s42524-023-0253-5
Keywords: ultra-high arch dam columnar jointed basalt low-heat cement concrete temperature controlled crackprevention million-kilowatt unit intelligent construction
Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane
Peter TSCHERNUTTER
Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1, Pages 63-70 doi: 10.1007/s11709-010-0016-3
Keywords: embankment dam bituminous concrete membrane rock-fill material properties deformation behavior
Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station
Shen Mingliang,Chen Lihua,Chen Wei,Sheng Lemin,Su Junan
Strategic Study of CAE 2004, Volume 6, Issue 6, Pages 68-73
In view of simulation for concrete dam construction process of the Xiangjiaba Hydro Station, the papersystemically analyses the relation and condition among various main factors during concrete dam constructionBy using algorithmic procedure of choosing block from separate bin, simulation result for concrete damconstruction is made in the form of three-dimension visual simulation.machine and equipment and verification of dam construction schedule.
Keywords: Xiangjiaba Hydro Station construction simulation concrete construction comparison of drafts
Qixiang FAN
Frontiers of Engineering Management 2017, Volume 4, Issue 2, Pages 231-237 doi: 10.15302/J-FEM-2017103
Keywords: super-high arch dam intelligent construction mass concrete temperature control structure behavior control anti-erosion concrete low-heat portland cement large-discharge and high-velocity spillway tunnels large
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 20-27
Keywords: high core rock-fill dam high concrete dam construction quality construction schedule real-time monitoring digital dam
Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 92-101 doi: 10.1007/s11709-010-0009-2
Keywords: fill dam consolidation analysis unsaturated geo-materials impounding construction
Three-dimensional seismic response analysis of a concrete-faced rockfill dam on overburden layers
Dakuo FENG, Ga ZHANG, Jianmin ZHANG,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 2, Pages 258-266 doi: 10.1007/s11709-010-0031-4
Keywords: concrete-faced rockfill dam (CFRD) overburden layer dynamic analysis finite element method (FEM)
Challenges of high dam construction to computational mechanics
ZHANG Chuhan
Frontiers of Structural and Civil Engineering 2007, Volume 1, Issue 1, Pages 12-33 doi: 10.1007/s11709-007-0002-6
Keywords: reservoir engineering hydro-power development state-of-the-art computational earthquake
Key Technologies in the Design and Construction of 300 m Ultra-High Arch Dams
Renkun Wang
Engineering 2016, Volume 2, Issue 3, Pages 350-359 doi: 10.1016/J.ENG.2016.03.012
Starting with the Ertan arch dam (240 m high, 3300 MW) in 2000, China successfully built a total ofThe design and construction of these 300 m ultra-high arch dams posed significant challenges, due toIn this paper, the author summarizes various key technological aspects involved in the design and constructionm ultra-high arch dams, including the strength and stability of foundation rock, excavation of the dam, treatment of a complex foundation, concrete temperature control, and crack prevention.
Keywords: Ultra-high arch dam Shape optimization Arch dam overall safety Seismic safety Concrete temperature control
Title Author Date Type Operation
Research on key construction technologies of concrete dam heightening project
Zhou Hougui
Journal Article
China's High Dams Construction and Research on Science and Technology
Chen Zongliang
Journal Article
A Brief Review of Rock-Filled Concrete Dams and Prospects for Next-Generation Concrete Dam Construction
Feng Jin, Duruo Huang, Michel Lino, Hu Zhou
Journal Article
163Concrete dam construction management and decision-making based on virtual reality
Zhou Hougui,Cao Shengrong,Wang Quande
Journal Article
Construction technologies of controlled demolition of concrete andtheir comprehensive applications inDanjiangkou Dam heigh ting project
Zhou Hougui
Journal Article
GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application
Li Jingru,Zhong Denghua
Journal Article
Key technical innovations in the construction of Baihetan Hydropower Station Project
Journal Article
Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane
Peter TSCHERNUTTER
Journal Article
Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station
Shen Mingliang,Chen Lihua,Chen Wei,Sheng Lemin,Su Junan
Journal Article
Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha
Qixiang FAN
Journal Article
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Journal Article
Evaluation method of dam behavior during construction and reservoir filling and application to real dams
Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,
Journal Article
Three-dimensional seismic response analysis of a concrete-faced rockfill dam on overburden layers
Dakuo FENG, Ga ZHANG, Jianmin ZHANG,
Journal Article